摘要

In this note, we show that there are some errors in the 0-1 integer programming model in recent paper [Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm 17 (2006) 493-507]. We point out these errors and correct them.

  • 出版日期2014-2

全文