Upgrading of Kish Island Markazi wastewater treatment plant by MBBR

作者:Ahmadi Mehdi*; Izanloo Hassan; Alian Aliakbar Mehr; Amiri Hoda; Sepehr Mohammad Noori
来源:Journal of Water Reuse and Desalination, 2011, 1(4): 243-249.
DOI:10.2166/wrd.2011.038

摘要

The potential of a moving bed biofilm reactor (MBBR) in full scale has been investigated as an alternative for upgrading of the Kish Island Markazi wastewater treatment plant. In this regard, the activated sludge process (ASP) upgraded to an MBBR process and different operating parameters results in this change compared with ASP. Results show that with increasing the average flow influent from 1,049 +/- 88 to 1,944 +/- 275 m(3) d(-1) and reducing the aeration tank volume from 300 to 150 m(3), organic loading rate (OLR), mixed liquor suspended solids (MLSS), sludge retention time (SRT), sludge volume index (SVI), hydraulic loading rate (HLR) and hydraulic retention time (HRT) were changed to 0.32 +/- 0.04-1.8 +/- 0.36 kg COD/m(3) d, 2,641.19 +/- 284.99-7,354.2 +/- 778.35 mg L-1, 5.28 +/- 0.64-22.1 +/- 1.53 d, 135 +/- 37.3-29.2 +/- 3.81, 23.14 +/- 1.94-43.37 +/- 5.04 m d(-1) and 2.76 +/- 0.22-1.48 +/- 0.18 h, respectively. Effluent concentrations under this operation condition were well below the discharge limits for irrigation water. Therefore, the MBBR process is a good alternative for upgrading wastewater plants especially when there is inadequate space or modifications are needed that will require large investment.

  • 出版日期2011