摘要

In order to evaluate the relative contribution of both mechanical and electrochemical processes at the crack tip during Stress Corrosion Cracking propagation, an original combination of controlled pre-cracking followed by thermal pre-oxidation of SCC specimens was developed. It allowed localizing dissolution at the crack tip for Zircaloy-4 tested in halide solutions under potentiostatic polarization. Digital Image Correlation and electrochemical methods were then carried out to study correlations between the stress intensity factor, the crack length and the measurements of dissolution current.

  • 出版日期2015-4