摘要

This paper proposes a two-phase approach for optimal short-term operational scheduling with intermittent renewable energy resources (RES) in an active distribution system. The first phase determines the amounts of purchased power from the market and the unit status of distributed generation (DG) and feeds the data into the second phase, a real-time scheduling coordination with hourly network reconfiguration. The two-phase proposed approach is applied to a case study of a sixteen-bus test system that uses synthetic data from renewable power generators and forecasts local user demands with a sampling time of five minutes.

  • 出版日期2015-12