摘要
In this paper, we consider the metric uncapacitated facility local. ion game with service installation costs. Our main result is an 11-approximate cross-monotonic cost-sharing method under the assumption that. the installation cost depends only oil the service type
- 出版日期2009-11
- 单位北京工业大学