Water detritiation processing of JET purified waste water using the TRENTA facility at Tritium Laboratory Karlsruhe

作者:Michling R*; Bekris N; Cristescu I; Lohr N; Plusczyk C; Welte S; Wendel J
来源:Fusion Engineering and Design, 2013, 88(9-10): 2361-2365.
DOI:10.1016/j.fusengdes.2013.05.070

摘要

A Water Detritiation System (WDS) is required for any Fusion machine in order to process tritiated waste water, which is accumulated in various subsystems during operation and maintenance. Regarding the European procurement packages for the ITER tritium fuel cycle, the WDS test facility TRENTA applying the Combined Electrolysis Catalytic Exchange (CECE) process was developed, installed and is currently in operation at the Tritium Laboratory Karlsruhe (TLK). %26lt;br%26gt;Besides the on-going R%26D work for the design of ITER WDS, the current status of the TRENTA facility provides the option to utilize the WDS for processing tritiated water. Therefore, in the framework of the EFDA JET Fusion Technology Work Programme 2011, the TLK was able to offer the capability on a representative scale to process tritiated water, which was produced during normal operation at JET. The task should demonstrate the availability of the CECE process to handle and detritiate the water in terms of tritium enrichment and volume reduction. %26lt;br%26gt;The operational program comprised the processing of purified tritiated water from JET, with a total volume of 1801 and an activity of 74 GBq. The paper will give an introduction to the TRENTA WDS facility and an overview of the operational procedure regarding tritiated water reduction. Data concerning required operation time, decontamination and enrichment performances and different operating procedures will be presented as well. Finally, a preliminary study on a technical implementation of processing the entire stock of JET tritiated water by means of water reduction and tritium recovery and an impact of storage capacity at JET will be discussed.

  • 出版日期2013-10