摘要

This paper introduces the methods development of the modern phase earthing system. The target is to reduce the harmful short interruptions experienced by the customers and electricity producers with temporary phase-to-earth faults of a medium-voltage (MV) system. Especially in neutral isolated MV networks, the earth fault arc does not usually become extinct without an automatic reclosing function. It can be extinguished using a shunt circuit breaker (SCB) to earth the faulty phase temporarily at the feeding primary substation. The functioning of the SCB does not cause any voltage break to customers or distributed-generation units connected to the MV or low-voltage system. An essential requirement enabling the application of the phase earthing is that the residual current at the fault location must be determined reliably in order to evaluate fulfilling the touch voltage regulations. The inexact information on the magnitude of the residual current has restricted the utilization of phase earthing. Main attention was paid to the modeling of the phase earthing system for developing the method for determining the residual phase-to-earth current. The developed novel algorithm was tested by applying the PSCAD simulation environment. The results show that the residual fault current can be calculated with the actual fault case (e.g., IED or centralized protection system). The prototype of the SCB has also been installed and tested with artificial earth faults.

  • 出版日期2017-6