摘要

The scheduling of byproduct gas in the whole energy system was considered for an optimum operation. A mixed integer linear programming (MILP) model for a plant-wide optimization of byproduct gases was performed. A more precise and objective penalty weight was proposed as a constraint in the function. Case study shows that compared with precious approach, the proposed one presents a good performance to reduce 5.1% total cost.

全文