This paper studies a real-world problem of simultaneous lot-sizing and scheduling in a capacitated flow shop. The problem combines two significant characteristics in production which are multiple-stage production with heterogeneous multiple machines and sequence-dependent setup time. Setup time does not hold the triangle inequality, thus there may be a setup for a product without actual production. Consequently, a novel mixed integer programming (MIP) formulation is proposed and tested on real data sets of wheel production. Exact approaches cannot find a feasible solution for the model in a reasonable time, so MIP-based heuristics are developed to solve the model more quickly. Test results show that the formulation is able to contain the problem requirements and the heuristics are computationally effective. Moreover, the obtained solution can improve on a real practice at the plant.