摘要

In a future distribution network, it will be difficult to maintain system voltage because a large number of distributed generators are introduced into the system. The authors have previously proposed a voltage profile control method using power factor control of distributed generators. When all information on the system is available, an ideal stationary solution of control orders to distributed generators is given by an optimization calculation. However, it is difficult to apply optimization control in real time because a long calculation time is required for the optimization. Therefore, it is possible that a voltage change may occur before the power factor control has finished. Thus, in this paper, we develop a new control method which can save the excessive voltage changes by taking into consideration the controlled response time of distributed generators. The proposed method was tested in a 24-node distribution network model.

  • 出版日期2012-4-15