摘要

The determination of work programmes for bridges that maximise benefit to all stakeholders requires consideration of not only the condition of the elements of which a bridge is comprised, but also the performance of the structure as a whole. This is required because although some costs can be related to the condition of the elements, others, such as the costs of travelling over the bridge, cannot. One possible methodology to do this involves linking relevant costs to structure performance states (SPS) that are determined from the element condition states (CSs). However, even a bridge with a moderate number of elements and element CSs results in a large number of possible SPSs and an unwieldy amount of required work to estimate the costs associated with each. This work can be drastically reduced, however, by exploiting the almost linear system behaviour of the bridge that can occur between many combinations of element CSs. This article presents a methodology for relating SPSs to element CSs for the purpose of determining structure level costs. This methodology is demonstrated in several examples, wherein the effects of exploiting the linearity of the system behaviour to reduce the computational effort are also explored.

  • 出版日期2013-8-1