摘要

In this note, we prove that both problems studied by Cheng et al. [Cheng, T. C. E., Hsu, C.-J., & Yang, (2011). Unrelated parallel-machine scheduling with deteriorating maintenance activities. Computers and Industrial Engineering, 60, 602-605] can be solved in O(n(m+3)) time no matter what the processing time of a job after a maintenance activity is greater or less than its processing time before the maintenance activity, where m is the number of machines and n is the number of jobs.

全文