摘要

Process intensification on seawater reverse osmosis (SWRO) plant can be realized through the increase of both train capacity and module size. The investigations were conducted based on a two-staged medium-sized (capacity of 25,000 m(3)/day) SWRO plant, Lanzarote IV, Canary Island. Comparison between all-16-inch (first and second stages with GE Osmonics' AE-1600 and AG-1600, respectively) and mixed (only the first stage fitted with 16-inch) pressure vessels (PV) was also discussed herein. Exergy and exergoeconomic analysis was perforrried to calculate specific energy consumption (SEC), effergy and water costs. ROSA 9.1 (for 8-inch diameter modules) and Winflows 32 (for 16-inch diameter modules) were utilized to obtain energetic and technical data. The analysis revealed that the incorporation of all-16-inch modules on Lanzarote IV allowed more versatile train size design. The availability of the train was not the sole determining factor for the total cost of 16-inch PV-based configurations since the membrane capital cost only constitutes 2-3% of the total cost. In fact, the simultaneous increase in both train size and PV diameter can significantly offer operational advantages in term of technical, economical and plant footprint for a medium-size SWRO plant.

  • 出版日期2017-4-15