摘要

Minimising earliness and tardiness penalties as well as maximum completion time (makespan) simultaneously on unrelated parallel machines is tackled in this research. Jobs are sequence-dependent set-up times and due dates are distinct. Since the machines are unrelated, jobs processing time/cost on different machines may vary, i.e. each job could be processed at different processing times with regard to other machines. A mathematical model which minimises the mentioned objective is proposed which is solved optimally via lingo in small-sized cases. An intelligent water drop (IWD) algorithm, as a new swarm-based nature-inspired optimisation one, is also adopted to solve this multi-criteria problem. The IDW algorithm is inspired from natural rivers. A set of good paths among plenty of possible paths could be found via a natural river in its ways from the starting place (source) to the destination which results in eventually finding a very good path to their destination. A comprehensive computational and statistical analysis is conducted to analyse the algorithms%26apos; performances. Experimental results reveal that the proposed hybrid IWD algorithm is a trustable and proficient one in finding very good solutions, since it is already proved that the IWD algorithm has the property of the convergence in value.

  • 出版日期2014