摘要
Based on the 2-dimensional design, this paper takes an office building in Nanjing as an example to use the BIM technology for the 3-dimensional optimization. With the detailed layout of pipelines, it sets the elevation to replan the original unreasonable designing. Then based on the BIM technology, it uses Navisworks to carry out the collision detection, puts forward the adjustment scheme, and gives types of invalid collision according to the practical experience. And finally it sums up some experiences, which provide optimization scheme for the future design.
- 出版日期2016
- 单位南京师范大学