摘要

Based on actual observation of the boarding and alighting time of passengers at Xi'an metro station firstly, this paper analyzes the dwell process of metro trains, then analyzes the time of sub-process in detail and builds a dwell time calculation model. Finally, the paper verifies the established model with the observed station dwell time of metro trains. The model can provide the basic data support for metro companies to dispatch trains reasonably and improve the efficiency of metro trains. Also, it can be used for metro train operation simulation and the metro network evaluation.

  • 出版日期2013
  • 单位666

全文