摘要

This paper deals with a single machine scheduling problems with availability constraints. The unavailability of machine results from periodic maintenance activities. In our research, a periodic maintenance consists of several maintenance periods. We consider a machine should stop to maintain after a periodic time interval or to change tools after a fixed amount of jobs processed simultaneously. Each maintenance period is scheduled after a periodic time interval. We study the problems under deterministic environment and flexible maintenance considerations. Preemptive operation is not allowed. In addition, we propose a more reasonable flexible model for the real production settings. The objective is to minimize the makespan. The proposed problem is NP-hard in the strong sense and some heuristic algorithms are provided. The purpose is to present an efficient and effective heuristic algorithm so that it will be straightforward and easy to implement. Computational results show that the proposed algorithm first fit decreasing (DFF) performs well.