摘要

In this paper we study a problem of sequencing jobs in a machine with programmed preventive maintenance and sequence-dependent set-up times. The problem combines two NP-hard problems, so we propose a heuristic method for solving it, which hybridizes multi-start strategies with Tabu Search. We compare our method with the only published metaheuristic algorithm for this problem on a set of 420 instances. The comparison favors the method developed in this work, showing that is able to find high quality solutions in very short computational times.

  • 出版日期2013-12

全文