摘要

The installation of a 100-MeV proton linac at the Korea Multi-purpose Accelerator Complex (KOMAC) was completed in December 2012, and the 100-MeV linac were successfully commissioned with user service started in July 2013 through either a 20-MeV beamline or a 100-MeV beamline. In addition, we have accumulated operation data for stabilizin the linac system and the utilities. This paper reports both our experiences that were accumulated during the commissioning and the operation of KOMAC 100-MeV proton linac and our future plans.

  • 出版日期2015-2