摘要

In this study, a bench-scale Cyclic Activated Sludge Technology (CAST) reactor (72?L), fed with domestic sewage, was operated in alternating anoxic-aerobic operation mode to investigate the feasibility of achieving short-cut nitrification and denitrification with a real-time control strategy. An online system for controlling the length of the aeration and stirring phases was implemented, based on pH and oxidation-reduction potential signals, to switch between aerobic and anoxic sequences. Results show that the real-time control strategy was successful in achieving a stable nitrogen removal performance. Furthermore, short-cut nitrification can be achieved by controlling aeration length under the modified real-time control strategy. Gradually reducing the energy supply for nitrite-oxidizing bacteria caused the limitation of their growth and, finally, their elimination. When short-cut nitrification was obtained, the nitrite pathway became the primary way for nitrogen removal, and aeration duration was reduced by 28.4%.

全文