Based on lossless transmission line theory, a formula to calculate the voltage distribution along ultra high voltage (UHV) transmission line, which is connected to power grid under no-load condition, is derived. During the derivation of the formula, the parameters of UHV transmission line and configuration of high voltage reactor in disconnected no-load transmission line are comprehensively considered, and the extreme length of UHV transmission line under different grid voltage connected to no-load UHV transmission line. Under the same voltage connected to no-load UHV transmission line, if actual length of UHV transmission line exceeds the extreme length, it is necessary to configure steady-state overvoltage device to avoid such a condition that the voltage along the connected no-load UHV transmission line exceeds 1000 kV. The proposed method remedy the defect of exising judging methods that depend on power system simulation software and a lot of simulations have to performed. Comparison of the judged result by the proposed method with the result from PSD-BPA simulation software shows that the proposed method can give accurate and reliable result.

  • 出版日期2011-2

全文