摘要

Grade estimation is very important in designing open pits. In the process of grade estimation, underestimation can result in loss of economic ore, whereas overestimation would unnecessarily increase stripping ratio. Normally, kriging method, which suffers from underestimation and/or overestimation due to smoothing effect, is used for grade estimation. To overcome drawbacks of the kriging method, more efficient techniques such as conditional simulation can be applied. In this paper, utilizing sequential Gaussian conditional simulation, grade models were constructed for Sungun copper deposit situated in the North West of Iran. According to the obtained results, it was observed that conditional simulation can effectively cope with the weakness of kriging method. Also, it was observed that as compared to the kriging method, grade distribution, resulted from the conditional simulation, is almost identical to that of the real exploration data. Accordingly, using conditional simulation, the amount of mineable ore was significantly increased, and also, average net present value as the mines%26apos; most important economic indicator was improved by 40%.

  • 出版日期2013-1