摘要

In this note, we show that the main results in the two papers [C.C. Wu, W.C. Lee, Single-machine and flowshop scheduling with a general learning effect model, Computers and Industrial Engineering 56 (2009) 1553-1558, W.C. Lee, C.C. Wu, Some single-machine and m-machine flowshop scheduling problems with learning considerations, Information Sciences 179 (2009) 3885-3892] are incorrect.

  • 出版日期2010-10-1