摘要

This paper deals with an Extremum Seeking Control MPPT algorithm for grid-connected PV systems without intermediary DC-DC converter stage. The method uses the DC-link voltage ripple as dithering signal, which "naturally" results from the grid inverter operation. A thorough analysis emphasizes the significant variation of system behaviour with the irradiance. Relevant control design guidelines and necessity of an adaptive control approach for fast-changing irradiance tracking emerge from this analysis. MATLAB (R)/Simulink (R) numerical simulations are presented in order to illustrate the closed-loop dynamic performance under various scenarios, which also allows for assessing advantages and limitations of the proposed method.

  • 出版日期2015-1