摘要
This report describes immediate implant placement after the extraction of a vertically fractured tooth. During the healing phase, a resin-bonded prosthesis was inserted as a provisional restoration. After the creation of the optimal emergence profile and papillae with the provisional restoration, the definitive metal ceramic crown was fabricated. (J Prosthet Dent 2012;107:7-10)
- 出版日期2012-1