A PTAS for the p-batch scheduling with p(j)=p to minimize total weighted completion time

作者:Yuan Jinjiang; Shang Weiping
来源:Journal of Industrial and Management Optimization, 2005, 1(3): 353-358.
DOI:10.3934/jimo.2005.1.353