摘要

In this article, we consider the project critical path problem in an environment with hybrid uncertainty. In this environment, the duration of activities are considered as random fuzzy variables that have probability and fuzzy natures, simultaneously. To obtain a robust critical path with this kind of uncertainty a chance constraints programming model is used. This model is converted to a deterministic model in two stages. In the first stage, the uncertain model is converted to a model with interval parameters by alpha-cut method and distribution function concepts. In the second stage, the interval model is converted to a deterministic model by robust optimization and min-max regret criterion and ultimately a genetic algorithm with a proposed exact algorithm are applied to solve the final model. Finally, some numerical examples are given to show the efficiency of the solution procedure.

  • 出版日期2012-3