摘要

In this paper, we study the cyclic scheduling problem for electroplating lines where products are loaded into the system at one end and unloaded at the other end. The electroplating jobs must be processed within a given time window in each tank. There is no buffer between tanks. Two hoists sharing a common track are used to move products between the tanks in the production line. The objective is to minimize the production cycle time through scheduling hoist moves. A solution procedure is proposed in this study. The production line is first divided into two non-overlapping zones with a hoist assigned to each zone. Then a mixed integer linear programming model is developed for scheduling hoist moves. Computational results on a benchmark example problem are given in the paper to demonstrate the application of the proposed method.