摘要

This paper considers a two-stage assembly scheduling problem of N products with setup times to minimize the makespan. In this problem, there is a machining machine which produces components in the first stage. When the required components are available, a single assembly machine can assemble these components into products in the second stage. A setup time is needed whenever the machining machine starts processing components, or the item of component is switched on the machine. The problem is formulated as a mixed integer programming model, and several properties for finding optimal solutions are developed. Moreover, an efficient heuristic based on these optimal properties is proposed. A lower bound is derived to evaluate the performance of the proposed heuristic. Computational results show that the proposed heuristic can obtain a near optimal solution in almost zero time and the average percentage deviation is only 0.478.

  • 出版日期2015-10